EVALUASI KEBIJAKAN PERAWATAN PENGGANTIAN KOMPONEN KRITIS PADA MESI PENCUCI DAN PEMISAH TEMBAGA ( MPPT) UNTUK MEMINIMASI DOWNTIME DAN BIAYA PADA DEPARTEMEN PEMURNIAN

Undergraduate Theses from JIPPTUMG / 2017-01-25 19:53:07
Oleh : Ony Suryono
Dibuat : 2017-01-25, dengan 4 file

Keyword : Komponen Kritis

Komponen kritis adalah suatu komponen yang sangat penting dalam suatu mesin karena apabila komponen tersebut mengalami kerusakan dapat mengganggu kinerja mesin tersebut dan bahkan dapat mengakibatkan kerugian bagi perusahaan. pada mesin MPPT unit Chisseling Device adalah yang memiliki frekuensi kerusakan paling tinggi sehingga penelitian ini tertuju pada unit tersebut untuk dapat menentukan komponen mana yang termasuk dalam komponen kritis. Untuk menentukan interval waktu perawatan yang optimal pada kebijakan perawatan diperlukan data-data biaya dan biaya perbaikan. Biaya perawatan penggantian komponen terdiri dari biaya overtime untuk tenaga kerja dan biaya komponen (harga komponen/unit ).
Pada pengolahan data telah diketahui besar biaya kerugian yang dialami perusahaan apabila terjadi kerusakan pada komponen cylinder hidraulik yang harus melakukan penggantian komponen pada saat proses produksi sedang berlangsung yaitu sebesar Rp. 129.776.132, yang terdiri dari biaya komponen ( harga komponen/unit ) sebesar Rp. 12.500.000 dan biaya konsekuensi kerugian dikalikan rata-rata waktu perbaikan karena kerusakan komponen sebesar Rp. 117.276.132. Sedangkan biaya yang diperlukan untuk melakukan penggantian komponen cylinder hidraulik yang terencana dan dilakukan diluar jam kerja normal sebesar Rp. 12.533.500,- yang terdiri dari biaya komponen ( harga komponen/unit ) sebesar Rp. 12.500.000 dan biaya tenaga kerja karena dilakukan diluar jam kerja normal dimana perusahaan harus membayar upah overtime/lembur kepada tenaga kerja tersebut sebesar Rp. 33.750 .
Penghematan yang dapat diperoleh perusahaan apabila melakukan kegiatan penggantian komponen cylinder hidraulik secara terjadwal atau terencana yaitu sebesar Rp.117.242.632,00. dimana penghematan tersebut didapat dari hasil pengurangan antara biaya kerugian yang dialami bila penggantian komponen pada saat proses produksi sedang berlangsung dengan biaya penggantian komponen diluar jam normal atau tidak pada saat terjadinya proses produksi.

Deskripsi Alternatif :

Critical components is a very important component in a machine because if the damaged components can interfere with the machine's performance and can even result in losses for the company. the MPPT machine Chisseling unit Device is one that has the highest frequency of damage that this study focused on the unit to be able to determine which components are included in the critical component. To determine the optimal maintenance intervals on the policies required data maintenance costs and repair costs. Maintenance costs of component replacement consists of overtime costs for labor and component costs (the price of the component / unit).
In the data processing has been known major losses to the company's costs in the event of damage to the hydraulic cylinder components that must perform the replacement of components during the ongoing production process is Rp. 129 776 132, which consists of the cost of components (components price / unit) of Rp. 12,500,000 and the cost of the consequences of the loss multiplied by the average time to repair because of damage to the components of Rp. 117 276 132. While the cost required to perform replacement of the hydraulic cylinder components were planned and carried out outside normal working hours Rp. 12.5335 million, - consisting of the component costs (the price of the component / unit) Rp. 12,500,000 and labor costs because it is done outside of normal working hours where the company has to pay overtime wages / overtime to the labor force of Rp. 33,750.
The savings that can be obtained when conducting the replacement of hydraulic cylinder components are scheduled or planned in the amount Rp.117.242.632,00. where the savings gained from the reduction of the cost of the losses suffered when the replacement of components during the production process is underway with the cost of replacement components outside normal hours or not at the time of the production process.

Copyrights : Copyright (c) 2001 by Digilib Universitas Muhammadiyah Gresik. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJIPPTUMG
Organisasi
Nama Kontakadmin@umg.ac.id
AlamatJl. Sumatera
KotaGresik
DaerahJawa Timur
NegaraIndonesia
Telepon
Fax
E-mail AdministratorAdmin@umg.ac.id
E-mail CKOAdmin@umg.ac.id

Print ...

Kontributor...

  • Any Savitry, Editor: admin perpustakaan UMG

Download...